Project Overview
A premium finish for a prestige workshop
BMW came to Ascoat with a tired, failing tiled floor at its Mulgrave workshop that required a complete renovation. As a luxury automotive brand, the new floor needed to deliver more than a cosmetic upgrade. It had to withstand the demands of a busy service environment while maintaining a high-quality finish.
Following a detailed consultation and assessment of the facility, our epoxy flooring system was selected for its durability, performance and finish. The result is a robust workshop floor built to handle constant traffic while maintaining BMW’s premium presentation standards.
The Challenge
The floor to match the brand
01
Failing tiled substrate
02
Large-scale removal
03
Heavy-duty use
04
Brand presentation
Our Solution
Robotic demolition, premium installation
We combined specialist robotic demolition with an industry-leading Flowcrete system to completely transform the 780m² workshop floor, creating a durable, high-performance surface suited to a busy automotive environment.
- Robotic demolition with DXR 300 equipment to remove 780m² of tiles and screed
- Over 130m³ of material cleared from the site
- New engineered screed installed as the base for the new system
- Flowcrete Flowshield UV system applied at 2–3mm thickness
- Enhanced abrasion resistance and UV stability for long-term durability

Before

preparation

installation

completed
Installation Process
Four stages, start to finish
01
Consultation & Assessment
Full inspection of the Mulgrave facility to confirm epoxy flooring as the right solution
02
Robotic Demolition
DXR 300 robot demolition equipment removed 780m² of tiles and screed over 3 days
03
New Engineered Screed
A new engineered screed installed as the base for the flooring system
04
Flowshield UV System
Flowcrete's 2–3mm epoxy system applied, finished with enhanced abrasion resistance and UV stability
The Details That Matter
A complete transformation, delivered fast
The scale of the renovation was significant. Over three days, more than 130m³ of tiles, screed and construction waste were removed from the Mulgrave workshop using DXR 300 robotic demolition equipment, clearing the way for a new engineered base and premium epoxy finish.
The completed Flowcrete system provides enhanced abrasion resistance and UV stability, giving BMW a durable floor designed for the demands of daily workshop use. With the renovation complete, the workshop was handed back to the team and put straight back into service.
Finish Colour
Lightbox Grey N33
Ready to upgrade your flooring?
Whether you’re upgrading an existing facility or building new, we deliver flooring systems built for performance and longevity.